Uniformat
The ASTM E1557 UNIFORMAT II Standard.
The ASTM E1557 UNIFORMAT II Standard provides a common structure for describing major building systems linking building conceptual design, cost estimating, facilities management, and life-cycle cost engineering.
The UNIFORMAT organizes information by functional elements (systems and assemblies) with the primary purposes of identifying functional elements in BIM models, and organizing preliminary project descriptions and early cost estimates.
You must be signed into your Google Account to open, save a copy and modify the Uniformat Calculation Template.
Uniformat Levels and Titles
A Substructure
- A10 Foundations
- A20 Basement Constructions
B Shell
- B10 Superstructure
- B20 Exterior Enclosure
- B30 Roofing
C Interiors
- C10 Interior Construction
- C20 Stairs
- C30 Roofing
D Services
- D10 Conveying Systems
- D20 Plumbing
- D30 Heating, Ventilating, and Air Conditioning (HVAC)
- D40 Fire Protecting Systems
- D50 Electrical Systems
E Equipment and Furnishings
- E10 Equipment
- E20 Furnishings
F Special Construction and Demolition
- F10 Special Construction
- F20 Selective Demolition
G Building Sitework
- G10 Site Preparation
- G20 Site Improvements
- G30 Site Civil/Mechanical Utilities
- G40 Site Electrical Utilities
- G90 Other Site Construction
Z General
- Z10 General Requirements
- Z20 Bidding Requirements, Contract Forms ..
- Z90 Project Cost Estimate
Related Topics
-
Miscellaneous
Engineering related topics like Beaufort Wind Scale, CE-marking, drawing standards and more. -
Process Control Systems Documentation
Documentation of process control systems - Block Flow Diagrams (BFD), Process Flow Diagrams (PFD), Piping and Instrumentation Diagrams (P&ID) and more.
Related Documents
-
BFD - Block Flow Diagram
A Block Flow Diagram is a schematic illustration of a major process. -
Bid Work Flow Template
A bid work flow template - Online with Google Docs. -
Cash Flow Diagrams
The future value of money. -
Contract Types
Commonly used engineering and construction contracts. -
CSI MasterFormat Specifications
Construction Specifications Institute's 2004 Master-Format Edition. -
HVAC Diagram - Online Drawing Tool
Draw HVAC diagrams online with this Google Drive drawing tool. -
Internal Rate of Return - IRR
Internal Rate of Return (IRR) - the break-even interest rate. -
Markup and Gross Profit
Profit vs. markup. -
Net Present Worth (NPW) of a Cash Stream
The value of a stream of payments is called the Net Present Worth (NPW). -
P&ID - Piping and Instrumentation Diagram
Schematic illustration of a functional relationship between piping, instrumentation and system components. -
Percentage
Working with relative values. -
Present Value
The value of money in the future is the Present Value.