Sponsored Links
If a project revenues exceeds projects cost - it has generated profit (or income).
can be expressed as
OP = Σ R - Σ C (1)
where
OP = operating profit
R = project revenues
C = project costs
can be expressed as
OP = 100 (Σ R - Σ C)/ Σ R (2)
Sponsored Links
Sponsored Links
Free SketchUp Engineering ToolBox - enabled for use with the amazing, fun and free Google SketchUp.
© The Engineering ToolBox 2005
8 8 6